This project included the removal and replacement of approximately 6,228 square feet of asphalt at 3 inches thick, as well as the installation of approximately 5,688 pounds of hot-rubber crack seal using a hydraulic pressured crack seal system. The application of a polymer modified slurry seal to approx 39,587 square yards in some areas and in other areas we applied an asphalt emulsion MTR to approx 128,168 square feet in 2 coats by spray. This was followed by striping and the repinning of 640 concrete wheel stops.
Gilbert Public Schools
Gilbert, AZ