The portion of Aquarium we were awarded consisted of 37,000 square yards of ABC install, grade and pave. There was 17,000 ton’s of GSA installed along with 7,500 ton’s of asphalt placed. 100% of the grading was completed with our crews and around 40% of the paving was completed by Phoenix maintenance paving crews.