The project at 4801 Alameda in Albuquerque, New Mexico, included the installation of a 167 x 4 feet concrete valley gutter to address a drainage problem at the property. The crew also replaced 150 linear feet of curb and gutter. A two coat Modified Tire Rubber (MTR) sealcoat was applied to the parking lot.