The Adam’s Traditional School project in Phoenix, Arizona included the application of two coats of MasterSeal MTR Rubberized Sealer on approximately 74,510 square feet. In addition, 1,349 square feet of failed asphalt was removed and replaced at a depth of 3 inches, and 3 speed bumps were installed. Striping was also performed on 4,610 linear feet.
Adam's Traditional
Phoenix, AZ
Copyright 2022 • Sunland Asphalt & Construction, LLC
Copyright 2022
Sunland Asphalt & Construction, LLC