This project consisted of milling 39,888 square yards to a depth of 2.50 inches. Fine grade, moisture condition and compact 39,888 square yards existing grade was also included in the scope of the project. Sunland also paved 39,888 square yards to a depth of 2.50 inches, while adjusting and raising existing utilities to match new asphalt elevation. Survey monuments were replaced and installed. Cracksealing and PMM sealer were completed on 66,225 square yards, including restripe done to match existing layout.
AAM Management Company
Scottsdale, AZ
Copyright 2022 • Sunland Asphalt & Construction, LLC
Copyright 2022
Sunland Asphalt & Construction, LLC