throughout the community, including milling 3 inches of existing asphalt concrete and paving 3 inches of new asphalt concrete with minimal striping required. The project presented a challenging schedule due to the community’s limited one-way in and one-way out access, which also impacted many of the internal roadways. Work was completed across approximately 1.1 million square feet, with 90% of the project self-performed by the team.